Building 3B

Groundbreaking: Q2 2026

±519,792 SF Spec Building

Speculative Building 3B

Integrity Way ​ | ​ Gaston, SC

Red Rock Developments is developing a ±519,792 SF speculative industrial building on ±53.94-acre lot within Sandy Run Industrial Park. The park is located in Lexington and Calhoun Counties, and is a ±760.9-acre, fully entitled industrial park with access to all utilities.

 

Building 3B will be equipped with ESFR fire suppression sprinkler systems, LED lighting, (98) 9’2” x 10’ dock-high doors, (4) drive-in doors and 36' clear heights. Additionally, there will be 260 car spaces (expandable to 368 spaces) and 135 trailer spaces available (expandable to 256 spaces).

Adjacent to I-26, the property is located ±4 miles to I-77, ±14 miles to I-20 and ±50 miles to I-95 allowing unparalleled access to markets and raw materials. The 12th Street Extension project is underway and will connect the park to Saxe Gotha Industrial Park, providing dual access from Sandy Run to I-77 and I-26.

 

Recent new users in the park include Smart Warehousing and Blanchard Machinery. Other nearby users include Amazon, Alpek, ZEUS, The Home Depot, Republic National Distributing Company, Laguna Tools, Nephron Pharmaceuticals Corporation, UPS and more.

Spec Building 3B - Specifications

Building

Building Size

±519,792 square feet

Available space

±519,792 SF warehouse/distribution

Office built-to-suit

Building dimensions

546’ x 952’

Site

±53.94 acres

Column spacing

52’ x 56’ | 65’ speed bay

Clear height

36’ clear first bay in minimum under joist

Construction

Roof

45 mil, white, mechanically fastened TPO

15 year NDL warranty

Walls

Tilt-up concrete

Floors

8” caulked floor

Fire Protection

ESFR sprinklered

Lighting

25 foot-candle 3’ AFF LED

Heating/Ventilation

Gas fired units

60” x 78” roof mounted fans for .25AC/hr

Truck Court

Truck loading dock

185’ deep truck court with
60’ concrete pad

Trailer storage

135 spaces (expandable to 256 spaces)

Dock doors

(98) 9’2” x 10’ dock-high door positions

(26) 7’ x 8’ mechanical levelers
(40,000 lbs)

Drive-in doors

(4) drive-in doors

Utilities

Power

Dominion Energy

(2) 2,000 AMP Panels

Gas

Dominion Energy

6” main / 2” service

Water

Calhoun County
10” main / 2” water line

Sewer

Calhoun County

8” main / 6” full building length with 3 laterals

Telecommunications

AT&T | Tri-Co Link

Construction Slated for Completion Q1 2027

±519,792 Speculative Building

Location

24 million​ people accessible within a 4-hour trucking time

How to use this map

Use the top left navigation bar to activate the following options:

Toggle layers to show/hide:
​ e-commerce/3PL locations, auto manufacturers, auto suppliers, aerospace suppliers, advanced manufacturers, distribution facilities, food manufacturers and healthcare manufacturers

View basemap options

Toggle on/off major airports, seaports and inland port locations

View 1-hour, 2-hour, 3-hour and 11-hour trucking drive time radii

Contact Us

Chuck Salley, SIOR

Managing Director

+1 803 401 4266

chuck.salley@colliers.com

Thomas Beard, SIOR

Vice President

+1 803 401 4247

thomas.beard@colliers.com

John Peebles, SIOR

Vice President
+1 803 401 4226

john.peebles@colliers.com

Leah Bailey, SIOR

Senior Vice President of Leasing

+1 704 619 3825

lbailey@redrockdevelopments.com

Featured research