Lot 4

For Lease or Sale

±1,201,200 SF Build-to-Suit

Lot 4 | Build-To-Suit

K Avenue ​ | ​ Gaston, SC

Red Rock Developments is developing a ±1,201,200 SF build-to-suit industrial building on ±117-acre lot within Sandy Run Industrial Park. The park is located in Lexington and Calhoun Counties, and is a ±760.9-acre, fully entitled industrial park with access to all utilities.

 

The Lot 4 site plan includes ESFR fire suppression sprinkler systems, LED lighting, (200) 9’ x 10’ dock-high doors per building, (4) drive-in doors per building and 40' clear heights.

Adjacent to I-26, the property is located ±4 miles to I-77, ±14 miles to I-20 and ±50 miles to I-95 allowing unparalleled access to markets and raw materials. The 12th Street Extension project is underway and will connect the park to Saxe Gotha Industrial Park, providing dual access from Sandy Run to I-77 and I-26.

 

Recent new users in the park include Smart Warehousing and Blanchard Machinery. Other nearby users include Amazon, Alpek, ZEUS, The Home Depot, Republic National Distributing Company, Laguna Tools, Nephron Pharmaceuticals Corporation, UPS and more.

Lot 4 Build-To-Suit - Proposed Specifications

Building

Building Size

±1,201,200 square feet

Building dimensions

1848’ x 650’

Site

±117 acres

Column spacing

52’ x 56’

65’ speed bay

Clear height

40’ clear first bay in
minimum underjoist

Municipality

Lexington County

Construction

Roof

60 mil, white, mechanically fastened TPO

membrane system with a two-layer R-20

insulation with twenty (20) year NDL warranty

Walls

Exterior walls to be painted tilt-up concrete, load bearing wall panels

Floors

8” thick 4000 psi
reinforced concrete slab

Fire Protection

NFPA 13 code compliant
K25.2 @ 45 psi ESFR

(2,000 GPM @ 100 HP pressure)

diesel fire pump included

Lighting

LED

Heating/Ventilation

(6) direct gas fired 5 HP 1.6M BTU

make-up air units & 24’ Diameter 1.5 HP Greenheck HVLS Fans

Truck Court

Truck loading dock

200’ deep truck court

60’ concrete apron

65’ speed bay

Trailer storage

135 spaces (expandable to 256 spaces)

Dock doors

(200) 9’ x 10’ dock-high door positions

(26) dock packages with mechanical levelers and seals

Drive-in doors

(4) 12’ x 14’ manual drive-in doors

Utilities

Power

Dominion Energy

4,000A electrical service

Gas

Dominion Energy

6” main / 2” service

Water

Calhoun County
10” main / 2” water line

Sewer

Calhoun County

8” main / (3) 6” laterals tie into 8” main

Telecommunications

AT&T | Tri-Co Link

Proposed Site Plan

±1,201,200 Build-To-Suit Building

Location

24 million​ people accessible within a 4-hour trucking time

How to use this map

Use the top left navigation bar to activate the following options:

Toggle layers to show/hide:
​ e-commerce/3PL locations, auto manufacturers, auto suppliers, aerospace suppliers, advanced manufacturers, distribution facilities, food manufacturers and healthcare manufacturers

View basemap options

Toggle on/off major airports, seaports and inland port locations

View 1-hour, 2-hour, 3-hour and 11-hour trucking drive time radii

Contact Us

Chuck Salley, SIOR

Managing Director

+1 803 401 4266

chuck.salley@colliers.com

Thomas Beard, SIOR

Vice President

+1 803 401 4247

thomas.beard@colliers.com

John Peebles, SIOR

Vice President
+1 803 401 4226

john.peebles@colliers.com

Leah Bailey, SIOR

Senior Vice President of Leasing

+1 704 619 3825

lbailey@redrockdevelopments.com

Featured research